Greece, Athens (2002-2003)
In 2002:
Technical aid for the control of the project and the follow-up of the Olympic equestrian park, with a particular care for the quality and the cost of the facilities (grounds, stables, training tracks) and their practicality (security, circulation paths...)
In 2003:
Technical assistance to the ODIE (State organisation in charge of horse racing and betting) for the follow-up of the building and starting up of the Markopoulo racecourse (built on the site of the equestrian events for the 2004 Olympic Games)