REFERENCES

Greece, Athens (2002-2003)


In 2002:

Technical aid for the control of the project and the follow-up of the Olympic equestrian park, with a particular care for the quality and the cost of the facilities (grounds, stables, training tracks) and their practicality (security, circulation paths...)

In 2003:

Technical assistance to the ODIE (State organisation in charge of horse racing and betting) for the follow-up of the building and starting up of the Markopoulo racecourse (built on the site of the equestrian events for the 2004 Olympic Games)

athnes_1_640


athnes_2_640


athnes_3_640