Greece, Athens (2002/2003)
Technical aid for the control of the project and the follow-up of the Olympic equestrian park, with a particular care for the quality and the cost of the facilities (grounds, stables, training tracks) and their practicality (security, circulation paths...)
Technical assistance to the ODIE (State organisation in charge of horse racing and betting) for the follow-up of the building and starting up of the Markopoulo racecourse (built on the site of the equestrian events for the 2004 Olympic Games)